Skip to content
REDBEARDDigital Engineering Studio Discuss your operation
PTEN

Custom systems

Not every process should become a system.

Before building anything, Redbeard finds out whether it is worth building. If it is, you hire it in stages: each stage produces something on its own, and each stage has a way out.

Fit

What makes a process fit, and what does not

You can check the list below on your own, today, without talking to anyone. If what describes your case sits under "does not fit when", the honest answer is that software is not your problem right now, and saying so is cheaper for both of us than finding out after three months of building.

Fits when

  • The work repeats and follows a rule, even if nobody has ever written that rule down.
  • Requests come in through several channels: chat, e-mail, phone, and none of them is the official one.
  • More than one person touches the same case, and knowing where it stands means asking someone.
  • Mistakes cost money or trust: rework, missed deadlines, a customer billed twice for the same thing.
  • The information lives in spreadsheets, conversations and people's heads, and closing the month is a reconstruction.

Does not fit when

  • The process changes every week. A system freezes decisions, and freezing something that is still taking shape is expensive and gets in the way.
  • The volume does not justify it. Three cases a month in a shared spreadsheet is the right answer, and it will keep being the right answer.
  • The answer is an internal agreement, not software. When two teams disagree about who decides, no system settles it. It only records the disagreement faster.
  • An off the shelf tool already solves it as it is, without bending your operation around it. In that case we tell you which one, and we do not build.

How it works

What you have in hand, at each moment

Contracting

Three commitments, not one

The risk of hiring a custom system is almost never technical. It is committing to a full amount before knowing exactly what will be built. That is why the contract is split, and you can stop after any stage and keep what it produced.

Process discovery

Hired on its own, priced on its own. This is where the process is mapped as it actually happens: where requests come in, who picks them up, where they stall, what has already been tried. It ends in a document describing the current process, the bottlenecks by name, and what each one costs in rework and delay.

The way out: the document is yours, and it still works if the build happens with another company, or with nobody.

Fixed scope

What will be built, written in enough detail to become a contract: screens, rules, integrations, what stays out. The price of the build is born here, after discovery, and not before. A price estimated without discovery is a guess wearing the clothes of a proposal, and it is where most projects that double in size begin.

The way out: the scope is yours, and any other supplier can quote against it.

Build and operation

The system is built against the approved scope, with an automated test for every rule that must not break unnoticed, and delivered with its documentation in your company's repository. Operation continues after delivery, on a monthly plan, and is contracted separately.

The way out: the code and the documentation are yours from day one, not from delivery.

Change

What happens when the scope changes halfway

It changes. It always changes, and anyone promising it will not is selling, not building. What prevents the friction is not blocking the change, it is having agreed beforehand what to do with it.

Ownership

What is yours, in writing

Technical lock in is rarely a clause. It is usually a consequence: code that exists only on the supplier's server, with no documentation and an unreadable history. The contract here inverts that, item by item.

Technical risk

How the system is kept from failing silently

The failure that costs money is not the one that takes the system down, because that one shows up immediately. It is the one that keeps running and returns the wrong number for three months. The four answers below exist against that kind.

The first step

What process discovery delivers

Not a score, not a certificate, not a report full of generic recommendations. It is your own process handed back in readable form, with the bottlenecks named in your words and what each one costs. Below, the shape of the document.

Process discovery · order handoff delivered
How the work happens today
An order closed in one tool is typed again, by hand, into anotherSales closes it in the CRM. Delivery starts from a spreadsheet rebuilt every morning
Bottleneck 1
The same order exists twice, and the two copies drift apartMeasured in the interviews: 4 to 6 corrections a month, found by the customer rather than by the team
Bottleneck 2
Nobody can say where an order stands without asking someoneCost: 2 to 3 interruptions a day for the one person who knows
Bottleneck 3
This is an agreement, not a systemSales and delivery disagree on when an order counts as confirmed. Software would record the disagreement faster, it would not settle it
Recommended next step
Scope for bottlenecks 1 and 2, in that orderBottleneck 3 leaves the scope by decision, and returns if the agreement gets settled

Example written with fictional data, to show the shape of the document. No client's process discovery is published, not even anonymized: what identifies a company is not its name, it is the shape of its process.

Limits

What Redbeard does not do

Open ended scope, billed by the hour, with no declared end

Hourly billing without a scope moves all the risk to whoever is paying, and removes any incentive for the supplier to finish. The scope is fixed before the build starts.

A deadline before discovery

A deadline given without knowing the process is a guess. When it slips, and it does slip, the conversation turns to blame instead of to the system.

Turning your project into portfolio material

No screen, name, logo or metric belonging to a client appears on this site or anywhere else. The screens published here are illustrations with fictional data, and they say so in the caption.

Promising cover that does not exist

The operation plans include a monthly routine and monitoring, not 24 hour attendance. Publishing a response time the operation does not meet would be easier, and it would be a lie.

Next step

Tell us about the process you want to change.

A description in plain language is enough for a first conversation: where the work comes in, who picks it up, where it usually stalls. If the answer is that it is not the right time, it comes back exactly like that.